Auburn Pond Dam Repair

This pond dam repair in Auburn, KS started with a pond that would fill, then slowly drain back to the same level every time. During inspection, we found moisture on the backside of the dam, indicating water moving through the embankment.

After reviewing the pond’s original construction history and drone footage, we saw no compactor on site. Once the dam was opened, the failure point was clear: black dirt, stumps, roots, and other organic material had been buried within the dam, with no evidence of a proper core trench or effective compaction.

That organic layer lined up almost exactly with the water level the pond would never rise past. We rebuilt the dam with proper compaction, expanded the pond, deepened it by roughly 4 feet, and removed an estimated 500 tons of shelf rock along the way.

Every bit of rock and clay was reused on site. No expensive haul-off, no wasted material, and a pond dam repair built with a better chance of long-term performance.

Leaky Pond Repair Kansas
Pond Dewater Kansas Pond Repair
Progress Pictures Kansas Pond Repair
Repair In Progress Core Trench Excavation
Core Trench Compaction in Keyway
Progress Pond Construction Rock Excavation and Burial
Overview Mid Pond Construction Kansas
Pond Restoration and Repair Kansas Land and Pond